Skip to content

Continuing full closure of Holzstraße in Dotzheim

Continuing full closure of Holzstraße in Dotzheim -

In this image there is a water fountain in the middle. In the background there is a house on the...
In this image there is a water fountain in the middle. In the background there is a house on the left side, Beside the house there are trees. At the top there is the sky. On the right side there is a small drum kept near the pole. In the background there are few vehicles parked in front of the houses.

Continuing full closure of Holzstraße in Dotzheim

Major pipeline works are set to restart on Holzstraße next week. The project, led by Stadtwerke München and Hessenwasser, will fully close a section of the road for nearly seven weeks. Residents and businesses in the area have been advised of the upcoming disruptions.

The works will begin on Monday, January 12, and continue until Friday, February 27. This follows a pause over the winter break. Stadtwerke München (SWM) is overseeing the main pipeline upgrades, while Hessenwasser GmbH handles the renewal of the water mains.

During the project, Holzstraße will be completely closed to cars and bicycles between house numbers 20 and 30. However, access to properties in the affected stretch will still be possible. Drivers and pedestrians can use Homburger Straße or the route via Dotzheimer Straße and Wiesbadener Straße to reach their destinations.

The closure will remain in place until late February, with no vehicle or bicycle access permitted through the designated section. Residents have been assured that alternative routes will stay open throughout the works. The upgrades aim to modernise essential infrastructure along Holzstraße.

Read also: